ICAD 3 and near Hameem Bridge, Abu Dhabi
ICAD 3 and Hameem Bridge Heavy-Transport Route
Road formation and a U-turn for the passage of loads of about 600 tons.

Parking built to carry loads of up to 1,000 tons, from formation level to base course.






Road formation and a U-turn for the passage of loads of about 600 tons.
Road widened and maintained for loads of up to 300 tons.
Full road rebuild, from milling the old asphalt to the wearing course.