Abu Dhabi Road Works and Infrastructure

Abu Dhabi Road Works and Infrastructure
Location
Abu Dhabi
Type of work
Road construction and asphalt

Full road rebuild, from milling the old asphalt to the wearing course.

Scope of work

  • Old asphalt milled and removed from site; formation level graded, watered and compacted.
  • Subgrade prepared at 20 cm and compacted to 97% MDD.
  • Sub-base 20 cm thick with CBR above 80% and base course 20 cm thick with CBR above 60%.
  • MC70 prime coat, 7 cm asphalt base course, tack coat and 5 cm asphalt wearing course.
  • Kerbstones and pavers installed for the parking area.

Site photos

Abu Dhabi Road Works and Infrastructure

More projects

Kizad, Abu Dhabi

Kizad Heavy-Load Parking

Parking built to carry loads of up to 1,000 tons, from formation level to base course.